Heraldnet.com
THURSDAY, AUGUST 21, 2008 7:05 pm
LocalNorthwestNation & WorldPoliticsSpecial ReportsPhotosColumnistsMultimedia 
RECENT POSTS:
Machinists to Boeing: We’re willing to strike  August 19

SPEEA: Boeing 'undermines' 787 by depending on foreign workers  August 18

Boeing to meet with Pentagon officials Saturday  August 14

Northrop: Air Force values 'getting more' tanker for its money  August 14

Tanker update: Boeing, Northrop respond to Pentagon meeting  August 12

Archives:
LINKS:

Airbus
Airbus
EADS
Orders and Deliveries

Analysts
Richard Aboulafia
Scott Hamilton

Blogroll
FleetBuzz
IAG Blog
Randy Tinseth's blog

Flight museum
Future of Flight
Museum of Flight

Labor Group
International Association of Machinists
Local 751 Machinists
SPEEA

Tanker competition
Air Force
Boeing's KC-767 tanker
Boeing's tanker blog
Government Accountability Office
Northrop's America's New Tanker
Northrop-EADS' KC-30

The Boeing Co.
Boeing Commercial Airplanes
Employment
New Airplane
Orders and Deliveries
RELATED ARTICLES:
Passenger recalls horror aboard Boeing MD-82  August 21
Contract talks: Boeing, Machinists differ on progress  August 21
153 perish in crash of Boeing MD-82  August 21
Boeing, Northrop await final tanker guidelines  August 21
Pentagon to release tanker requirements next week  August 20
153 die in Boeing airliner crash at Madrid airport  August 20
Aerospace electronics maker relocates to Paine Field  August 15
Tanker talks to resume on Saturday  August 15
Bothell firm says program aids flu fight  August 14
Qantas 747-300 suffers engine problem in flight  August 13
Interactive
Special report
 

ADVERTISEMENT

Aerospace Blog


 
 

Boeing gets first 787 cancellation

Jet maker wins first 767 order in 17 months


Posted at 10:38 am by Michelle Dunlop

The Boeing Co. saw the first cancellation of its 787 Dreamliner jet.

With nearly 900 orders for the Dreamliner, Boeing had yet to have an airline cancel an order, despite delays of the Dreamliner. But a spokeswoman for the jet maker confirmed the cancellation this morning, saying the carrier ordered another Boeing jet.

Azerbaijan Airlines ordered two 767-300 Extended Range jets and two 737-900ER’s. One of the 767 orders replaces a 787 order.

Noteworthy: this makes Boeing's first order for its 767 aircraft since Feb. 23, 2007.

The carrier, based in Baku, is the national airline of Azerbaijan. Azerbaijan Airlines has a total of eight Boeing airplanes on order: four 737-900ERs, two 787-8s and two 767-300ERs.



"We are eager to build our Boeing fleet with these additional 737s and 767s to meet continued demand for air travel in our region," said Jahangir Askerov, president of Azerbaijan Airlines, in a press release. "Today's order is yet another step forward in our strong relationship with Boeing. We look forward to operating the 787 and benefiting from its advanced performance features, however the 767-300ER is the economical and logical choice to fulfill our interim capacity targets."

Boeing’s 787 eventually will replace its 767. But the jet maker had hoped to win a multi-billion dollar aerial refueling contract for the Air Force with its “mighty” 767 jet, built in Everett.

Delays have pushed the first delivery of Boeing’s new 787 Dreamliner out about 15 months with additional deliveries being delayed on average by 20 months.

Boeing officials have said the 787 delays would give the 767 a boost, with airlines turning to the 767 to tie them over until the Dreamliner comes available.
READER COMMENTS
Be the first to comment.
You must be a registered user and verify your e-mail address to post comments to blogs or articles on HeraldNet.

To register, click here. To read other terms and conditions, click here.
Log in or register to post new commentLog out
  Return to Aerospace Blog
TODAY'S TOP JOBS
 View All Top Jobs 
Top Cars
Top Homes


ADVERTISEMENT